EX BREWERY 3 LEVANTER WAY.LITTLE BAY CAR PARK ADJ TO EXG MANHOLE 44 AND KEIGHTLEY WAY TUNNEL
Summary
O/20214/26
11/Mar/2026
Site Address: EX BREWERY 3 LEVANTER WAY.LITTLE BAY CAR PARK ADJ TO EXG MANHOLE 44 AND KEIGHTLEY WAY TUNNEL
Description of Development: URBAN WASTEWATER TREATMENT PLANT AT THE EX-BREWERY CRUSHER SITE; NEW PUMPING STATION AT LITTLE BAY CAR PARK; TRANSFER PIPELINE TOWARDS AND THROUGH KEIGHTLEY WAY TUNNEL AND BETWEEN TUNNEL EXIT AND BREWERY CRUSHER, INCLUDING DISCHARGE PIPE INSTALLATION AT EUROPA PROMENADE. OUTLINE PLANNING WITH EIA
Validated
Pending
Planning and Building
C BUHAGIAR
CBUHAGIAR@ECOWATERS.GI
R MASSIAS GREENBERG
GAMMA ARCHITECTS, SUITE 9/2, ICC, 2A MAIN STREET
RUTH@GAMMA.GI
11/Mar/2026
12/Mar/2026
27/Apr/2026
Documentation
11/Mar/2026 12:41:58
Other (1001_Existing Level 00)
11/Mar/2026 12:41:58
Other (1002_Existing Roof Plan)
11/Mar/2026 12:42:33
Other (1003_Existing East Elevation)
11/Mar/2026 12:42:49
Other (1051_Little Bay Pumping Station_Existing Site Plan)
11/Mar/2026 12:43:31
Other (1052_Little Bay Pumping Station_Existing Elevations & Sections)
11/Mar/2026 12:43:48
Other (2050_Little Bay Pumping Station_Proposed Site Plan with Roof Plan)
11/Mar/2026 12:44:03
Other (2100_Proposed Level 00)
11/Mar/2026 12:44:30
Other (2101_Proposed Roof Plan)
11/Mar/2026 12:44:30
Other (2102_Proposed East Elevation)
11/Mar/2026 12:44:51
Other (2103_Proposed North & West Elevations)
11/Mar/2026 12:45:03
Other (2104_Proposed Keightley Way Tunnel)
11/Mar/2026 12:45:15
Other (2150_Little Bay Pumping Station_Proposed Ground Floor Plan)
11/Mar/2026 12:45:35
Other (2151_Little Bay Pumping Station_Proposed Elevations Sections)
11/Mar/2026 12:45:45
Other (2528 DESIGN ACCESS 11 03 26)
11/Mar/2026 12:45:55
Other (2528 Document Issue Sheet PDF)
11/Mar/2026 12:46:30
Other (2528 View 01)
11/Mar/2026 12:46:30
Other (2528 View 02)
11/Mar/2026 12:46:30
Other (2528 View 03)
11/Mar/2026 12:46:42
Other (5132_site_plan_1002_Existing Roof Plan)
11/Mar/2026 12:46:53
Other (Urban Waste Water Treatment Plant Environmental Statement March 2026)
11/Mar/2026 12:47:07
Other (Urban Waste Water Treatment Plant NTS March 2026)
12/Mar/2026 11:09:02
Gibraltar Gazette (26/02/2026)
12/Mar/2026 12:54:51
Location Plan
12/Mar/2026 12:55:25
Existing North and West Elevations
12/Mar/2026 12:57:47
Location Plan
30/Mar/2026 16:04:09
The New People (24/03/2026)
30/Mar/2026 16:04:50
Gibraltar Gazette (26/03/2026)
30/Mar/2026 16:06:39
Gibraltar Chronicle (19/03/2026)
Comments Info